Skip to Content
Docs

Pipeline and forecast

Stages with probabilities and exit criteria, a weighted forecast per currency, weekly snapshots and deal signals.

A pipeline describes how a deal moves from first contact to won or lost. The forecast reads the same deals. This page explains how stages are set up, what happens when a deal moves, and how the forecast is built, frozen and compared week over week.

Pipelines and stages

A company can run several pipelines, for example one for new business and one for renewals. An administrator with the CRM settings permission configures them. Each stage has:

  • Order. The position of the stage in the pipeline.
  • Probability. A value from 0 to 100 %.
  • Forecast category. Pipeline, best case, commit, closed or omitted.
  • Stagnation threshold. The number of days after which a deal in this stage is marked stagnant.
  • Exit criteria. Up to five conditions a deal must meet before it leaves the stage.

Every pipeline has exactly one won stage, with probability 100 %, and at least one lost stage, with probability 0 %. A stage can be retired. Deals can no longer enter it, and its history stays.

Moving a deal

A deal always belongs to a company and carries a pipeline, a stage, an amount with its currency, a close date and an owner.

When you move a deal, Tosven checks the move:

  • Exit criteria. The deal must meet the criteria of the stage it leaves.
  • Lost. Losing a deal requires a reason from a closed list. A free note is optional.
  • Won. The close date is set to today.
  • Reopening. A closed deal can be reopened. The reopening is recorded like any other move.

Every move writes a row in the stage history, including the first stage at creation. The history cannot be skipped by an import, a bulk edit or an agent. It appears on the timeline of the 360 view.

The weighted forecast

The forecast groups deals by quarter, using the close date in your company's time zone. Within a quarter it shows one row per currency and forecast category, with the number of deals, the amount and the weighted amount.

weighted amount = amount × probability / 100

Sample data: OPP-2026-0412 is worth 48.000,00 € and sits in a stage with 60 %. It contributes 28.800,00 € to the weighted total.

CategoryMeaning
PipelineOpen and early
Best caseCould close in the period if things go well
CommitThe team expects to close it in the period
ClosedWon, with a close date in the period

Deals in a lost stage are omitted from the forecast.

  • Probability. It comes from the stage. You can override it on a single deal, and the override is logged.
  • Category override. A deal can be placed in another category than its stage suggests. This needs a reason and is logged with the stage history.
  • Side by side. Categorised and weighted totals appear together, next to won revenue and the optional target.
  • Currencies. Totals are shown per currency and never mixed. A converted total appears only when more than one currency is open, and it names the exchange rate source and its date.

Weekly snapshots and adjustments

Every Monday morning Tosven freezes a snapshot of the forecast: each open deal with its stage, category, amount, currency, probability, close date and owner. Snapshots are append-only. A user with the forecast management permission can also take one on demand.

The week-over-week view compares two snapshots and names each deal behind the change: new, increased, decreased, moved in, moved out, won or lost. If commit grew by 48.000,00 € since Monday, the view shows that OPP-2026-0412 is the reason.

A manager can adjust a category total. An adjustment requires a reason and is shown with its author and date, beside the figures from the deals. It never overwrites them.

Open pipeline, weighted forecast, won revenue and target are also verified measures in Lens, per currency, with drill-down to the deals.

Signals

Signals point at deals that need attention. They are fixed rules, not predictions, and each one states its reason and evidence.

  • Stagnant. The deal has been in its stage longer than the stage threshold. The days are shown.
  • Silent decision maker. No interaction with the decision maker for the number of days set on the stage.
  • Close date moved twice. The close date has slipped more than once, or it moved across a quarter boundary at a commit stage.
  • Past close date. The close date is in the past and the deal is still open.
  • Overdue invoice. The same customer has an invoice past its due date.
  • Housekeeping. A possible duplicate, or a contact who has left the company.

People are not scored, and no signal blocks a delivery or changes a customer's terms.

On the way

A Sales agent that turns signals into follow-up proposals is planned. Today the signals run as rules. Also planned: pipeline inspection (what changed since a date, as a waterfall), forecast against invoiced revenue as a standard Lens view, and quota hierarchies with territories.

Next steps

  • Quotes and approvals: sending the primary quote sets the deal amount.
  • Customers: companies, contacts and the 360 view behind each deal.
  • Lens: pipeline and forecast as verified measures.

On this page